Tuesday, September 12, 2017

HCA BLOCK 3 ROAD WORK STARTS @ SEP 26

As previously announced, HCA planned to repair, resurface, restripe, and renumber all Maple Ridge Road and Hickory Cluster asphalt streets and parking spaces next month.  However, to ensure proper sealant curing with Fall temperatures cooler and earlier than expected, our consultant now recommends that we repair minor cracks, seal, restripe, and renumber the still relatively new former Block 3 garage area asphalt in September, not October.

This early Phase 1 will impact Block 3 parking spaces 322-348 from 8:00 a.m. Tuesday, September 26 through 8:00 a.m. Wednesday, September 27, weather permitting.  During that time, impacted Block 3 residents who normally park in this part of Hickory Cluster can instead park in the lower exit end of the United Christian Parish parking lot, or on North Shore Drive.  UCP graciously agreed to allow up to 13 HCA Block 3 vehicles during the day, and up to 26 vehicles at night, to park in their lot during Phase 1 repair and sealing work.  All must display HCA parking hang tags while on UCP property.  Vehicles with visible HCA hang tags that remain parked in the work area will be towed nearby at owner risk and expense, and vehicles without visible HCA hang tags will be towed at owner risk and expense to the Henry's Wrecker Service impound lot in Fairfax, VA.  For more towed vehicle information, see a related post on this website or call Henry's at (703) 471-0010.