Updated September 30, 2021 ... click on images to enlarge
For reference only, not an endorsement or guarantee.
The Northern Virginia Stream Restoration Bank invested more than $870,000 in commercial developer environmental remediation funds to repair decades of erosion damage, redirect the streambed away from exposed sewer infrastructure, and enhance a 500+ ft. long area between Hickory Cluster Blocks 1 and 2, transforming an environmental liability into a valuable community asset, all at no direct cost to HCA Members. Work started September 19, 2016 and was completed in February 2017.
Study and Survey Watershed
Phase I Archeological Study
Design Concept
RA DRB Approve Plan
Design Plan
MBRT Approve
Fairfax County Approve
Corps of Engineers Approve
Approve Bridge Foundation
Approve Vantage Hill Section
Dredge Pond and Clean-Up
Close Funding
Start Construction
Remove Trees
Reconstruct Streambed
Replace Plants
Replace Bridge
Dedicate Bridge
Complete Vantage Hill Section
ACTIVITIES PENDING
Complete Asphalt Repair
The project includes a custom Goodman-style replacement footbridge designed in 2010 by, and dedicated in 2017 to, HCA Block 3 Member and architect-in-residence Ralph P. Youngren, FAIA.
GENERAL INFORMATION
Northern Virginia Stream Restoration Bank .
Hickory Cluster Stream Reach .
2018 Fairfax Connection News Article .
HCA STREAM RESTORATION DOCUMENTS
2010 WSSI Hickory Cluster Plan to RA DRB
2010 HCA Deed of Temporary Easement
2010 HCA Restoration Easement
2011 WSSI Tree Inventory Summary Table
2011 WSSI Update and Final Plan to RA DRB
2012 WSSI Update to RA DRB
2013 WSSI Tree Save Plan Maps
2016 WSSI Update to RA DRB
2016 WSSI/RA Responses to Sep 26 Homeowner Comments
HCA POND MAINTENANCE DOCUMENTS
1978 RHOA Position Paper / Memo
1981 RHOA Letter / MOU
1997 RA Letter
2015 RA Letter .
FAIRFAX COUNTY RELATED INFORMATION
Floodplains ... link requires update
Storm Drainage ... link requires update
Public Storm Drainage Easements .. link requires update