former official website of the goodman houses in reston, virginia, usa ... where founding visions, modernism, architecture, and the common good collide with entropy, anarchy, apathy, and unenlightened self-interest
Sunday, February 17, 2013
RELAC @ HCA FEBRUARY 20 MEETING
Mark Waddell and Michael Coleman, two of three proposed new owners of the RELAC system, confirmed yesterday that they will attend the Wednesday, February 20, 2013 HCA Board of Directors meeting at 7:30 p.m. in the Reston Community Center Lane Anne Rose Gallery. Mark and Mike will be available during the Member Forum at the start of the meeting to discuss their plans, and to answer Hickory Cluster customer questions. As always, the Member Forum portion of the HCA monthly meeting will be limited in duration to allow the Board to address many other important cluster business matters before adjourning.
Friday, February 8, 2013
RELAC PROPOSES NEW LOCAL OWNER
According to a joint petition filed by Aqua Virginia, Inc. and Reston RELAC LLC with the Virginia State Corporation Commission (SCC) on November 2, 2012, Reston RELAC is proposing to become the new owner of Reston Lake Anne Air Conditioning (RELAC) Corporation. On January 31, 2013, Aqua mailed a related public notice of the proposed transaction to all RELAC customers as required by the SCC. Also according to the petition:
Reston RELAC LLC is a partnership of Michael Coleman, Craig Nyman, and Mark Waddell. Mike Coleman has operated and maintained the system for the past 11 years. Craig Nyman worked for PEPCO for 14 years as a building energy and system improvement consultant. And Mark Waddell has 30 years of computer operations and security experience, is a RELAC system customer in Wainwright Cluster, and is President of the new corporation.
The sale will maintain future viability of the RELAC system for benefit of its customers, it will continue low noise operations, and it will facilitate the addition of modern technology to become a showcase of renewable energy.
RELAC will continue to provide service and charge the same rates under the same tariff terms and conditions as currently authorized. The change will be transparent to customers who will receive uninterrupted service.
The sale will also facilitate installation of two new evaporative cooling towers for the 2014 cooling season to greatly reduce dependence on Lake Anne water, to more completely control and enhance the cooling process, and to significantly improve the consistency of RELAC operations and tariff temperature performance. Aqua delivered the towers late last year.
In addition, RELAC plans customer service improvements including complete end-to-end service with residential system inspections and equipment maintenance options, a dedicated customer website, and other outreach programs to provide RELAC information at cluster meetings and open houses.
And according to Mr. Waddell, who is also President of nearby Wainwright Cluster Association: "We have been in discussions with Aqua Virginia for close to two years. ... We feel that a local smaller company with a service phone that rings in Reston could operate and improve the RELAC system with no increase in rates."
See the RELAC page and a recent related cooling tower post on this website for additional information.
Reston RELAC LLC is a partnership of Michael Coleman, Craig Nyman, and Mark Waddell. Mike Coleman has operated and maintained the system for the past 11 years. Craig Nyman worked for PEPCO for 14 years as a building energy and system improvement consultant. And Mark Waddell has 30 years of computer operations and security experience, is a RELAC system customer in Wainwright Cluster, and is President of the new corporation.
The sale will maintain future viability of the RELAC system for benefit of its customers, it will continue low noise operations, and it will facilitate the addition of modern technology to become a showcase of renewable energy.
RELAC will continue to provide service and charge the same rates under the same tariff terms and conditions as currently authorized. The change will be transparent to customers who will receive uninterrupted service.
The sale will also facilitate installation of two new evaporative cooling towers for the 2014 cooling season to greatly reduce dependence on Lake Anne water, to more completely control and enhance the cooling process, and to significantly improve the consistency of RELAC operations and tariff temperature performance. Aqua delivered the towers late last year.
In addition, RELAC plans customer service improvements including complete end-to-end service with residential system inspections and equipment maintenance options, a dedicated customer website, and other outreach programs to provide RELAC information at cluster meetings and open houses.
And according to Mr. Waddell, who is also President of nearby Wainwright Cluster Association: "We have been in discussions with Aqua Virginia for close to two years. ... We feel that a local smaller company with a service phone that rings in Reston could operate and improve the RELAC system with no increase in rates."
See the RELAC page and a recent related cooling tower post on this website for additional information.
Monday, February 4, 2013
METRORAIL STATION BUS SERVICE PLANNING
From the Fairfax County Dept. of Planning and Zoning today: "Fairfax County Dept. of Transportation is holding a series of public meetings designed to gather public input on the proposed Dulles Rail bus service plan. Please plan to attend one of the six scheduled meetings, or participate in an online chat to see and hear about this new service and provide your feedback."
See the schedule of upcoming meetings and meeting presentations on the Fairfax County Reston Master Plan Special Study website. Also see the Metrorail Redevelopment page on this HCA website for additional information.
See the schedule of upcoming meetings and meeting presentations on the Fairfax County Reston Master Plan Special Study website. Also see the Metrorail Redevelopment page on this HCA website for additional information.
HCA ROAD STORM SERVICE UPDATE
From Blade Runners midday today: "It appears we have another clipper headed our way this evening. Based on the forecast this may be a tad more severe than the others we have gotten this season. Roadway Clearing : No Service planned. Roadway ice control application: Service planned for this evening."
Saturday, January 26, 2013
HCA ROAD STORM SERVICE UPDATE
From Blade Runners this morning: "We took some time to drive by our properties this morning. I am happy to report that the Magic Salt outperformed anything we saw. There is a wintry mix scheduled for Monday morning. Our feeling is that the residual salt will take care of this. Therefore no service is planned unless the weather changes."
Friday, January 25, 2013
HCA ROAD STORM SERVICE UPDATE
From Blade Runners this morning: "As you know we are going to have another event this evening. This could be a similar event to what happened yesterday or could require plowing. We are preparing for either eventuality. There is some good residual ice control on most sites that will help with this storm. Roadway Snow Plowing: If accumulations reach 1 1/2 to 2 inches. Roadway Magic Salt ice control treatment : This evening should plowing not be needed, Saturday afternoon/evening if plowing is needed."
Thursday, January 24, 2013
HCA ROAD STORM SERVICE UPDATE
From Blade Runners this morning: "We had 1/2 inch of snow overnight. Temperatures are going to remain below freezing through the day. In addition we have some weather coming in tomorrow. For this reason we plan to apply ice control today. No roadway clearing/plowing planned at this time."
Wednesday, December 26, 2012
HCA ROAD STORM SERVICE UPDATE
From Blade Runners as of midday today: "The weather has headed in the direction as originally predicted. We now have the rain and the temps will be warm tonight. We do not plan to provide service this evening."
Tuesday, December 18, 2012
HCA TREE + DEBRIS UPDATE
HCA and RA DRB recently authorized Blade Runners to complete about 30 additional tasks clusterwide, ranging from completely removing higher risk and nuisance trees, to treating diseased and infested nuisance trees, to removing newly-stacked Cluster Clean-Up tree debris. These tasks were planned for completion by January 1, 2013 using available 2012 funds, but some tasks were delayed by other projects HCA and/or residents considered to be of higher priority, and by other Blade Runner storm training and customer demands.
Blade Runners is in the process of scheduling their expert staff and specialized equipment to coordinate and perform this large amount of work in the most efficient and cost-effective way possible. And they have asked for our patience. HCA updates the Trees page of this website as soon as Blade Runners updates their schedule. Current status was posted today. Except for storm or emergency response, Blade Runners is closed for business from December 25 through January 1.
Blade Runners is in the process of scheduling their expert staff and specialized equipment to coordinate and perform this large amount of work in the most efficient and cost-effective way possible. And they have asked for our patience. HCA updates the Trees page of this website as soon as Blade Runners updates their schedule. Current status was posted today. Except for storm or emergency response, Blade Runners is closed for business from December 25 through January 1.
Friday, December 7, 2012
RELAC COOLING TOWER UPDATE
Yesterday morning Aqua Virginia delivered two long-awaited and DRB-approved cooling towers to their RELAC facility.
Once fully installed, enclosed by special sound absorbing panels, and extensively tested, these two high capacity, controllable Evapco evaporative condensers will transfer heat from indoor chillers into the air rather than into Lake Anne.
RELAC typically runs two indoor chillers during the summer and maintains two additional indoor chillers as backups. Each tower can support two indoor chillers, so RELAC can also maintain one tower as a backup.
Recent intake modifications eliminated the need for emergency external diesel pumps during low water level conditions. If all goes well, use of the cooling towers will greatly reduce the need for warm, unreliable, and debris-filled Lake Anne water as a geothermal heat sink, possibly as early as the Summer 2013 cooling season.
Once fully installed, enclosed by special sound absorbing panels, and extensively tested, these two high capacity, controllable Evapco evaporative condensers will transfer heat from indoor chillers into the air rather than into Lake Anne.
RELAC typically runs two indoor chillers during the summer and maintains two additional indoor chillers as backups. Each tower can support two indoor chillers, so RELAC can also maintain one tower as a backup.
Recent intake modifications eliminated the need for emergency external diesel pumps during low water level conditions. If all goes well, use of the cooling towers will greatly reduce the need for warm, unreliable, and debris-filled Lake Anne water as a geothermal heat sink, possibly as early as the Summer 2013 cooling season.